Completion of Deliverable D.3.1, D.3.2

On the 27/12/2022 the deliverables D3.1:” Construction of the biophotonic system” and D.3.2:” Validation of the biophotonic system through checks and experiments”, which referred to the WP3 section: “Development of the biophotonic system” were completed.