On 27/07/2022 the deliverable D5.1: “Design and implementation of a protocol for handling laboratory animals” was completed and on 27/04/2023 the deliverables D.5.2: “Ex vivo validation of the efficiency of the biophotonic system” and D.5.2: “Pilot study of the system in situ”, related to WP5: “Pilot study of prototype in a preclinical environment”.